CCEA A-Level Technology and Design A2 2 Product/System Design and Manufacture coursework quiz quiz
12questions. Pick an answer and you'll see why right away.
The A2 2 Product/System Design and Manufacture project is:
Compared with the AS Product Development task, the A2 project is:
Who typically identifies the problem and client for the A2 project?
Integrating calculations and systems, electronic, mechanical or product detail into the development shows:
In the making stage, quality control means:
Working to a stated tolerance on a key dimension ensures that:
Health and safety in the project should be shown through:
Throughout the A2 folder, decisions should be:
The A2 evaluation should be:
The A2 project is assessed by:
A suitable A2 systems-route project would, for example:
What gives the A2 project the scope for the independent, justified work the top bands reward?