Skip to main content

← back to the guide

CCEA A-Level Technology and Design A2 2 Product/System Design and Manufacture coursework quiz quiz

12questions. Pick an answer and you'll see why right away.

  1. The A2 2 Product/System Design and Manufacture project is:

  2. Compared with the AS Product Development task, the A2 project is:

  3. Who typically identifies the problem and client for the A2 project?

  4. Integrating calculations and systems, electronic, mechanical or product detail into the development shows:

  5. In the making stage, quality control means:

  6. Working to a stated tolerance on a key dimension ensures that:

  7. Health and safety in the project should be shown through:

  8. Throughout the A2 folder, decisions should be:

  9. The A2 evaluation should be:

  10. The A2 project is assessed by:

  11. A suitable A2 systems-route project would, for example:

  12. What gives the A2 project the scope for the independent, justified work the top bands reward?