What is calculating the cost of a product?
Show answer
The total cost of a batch is: $total cost=total variable (direct) cost+fixed costs.\text{total cost} = \text{total variable (direct) cost} + \text{fixed costs}.Andthecostperitemis: And the cost per item is: cost per item=total costnumber made.\text{cost per item} = \frac{\text{total cost}}{\text{number made}}.$
What is q1?
Show answer
Give one example of a direct cost and one example of an indirect cost. [2 marks]
What is q2?
Show answer
Materials cost 3 pounds and labour 2 pounds per item; fixed costs are 500 pounds for 100 items. Find the total cost. [2 marks]
What is q3?
Show answer
Why does the cost per item fall as more are made? [1 mark]